Overview
- Updated On:
- May 10, 2023
- 3 Bedrooms
- 3 Bathrooms
- 344 m2
- Year Built: 2022
Description
New Construction Tropical Contemporary Home in Uvita is an expertly-designed, tastefully-finished property. Its spacious three bedroom, three bath 3700 sq/ft area is conveniently located in the highly sought-after Bahia Ballena zone, on a newly-paved road within walking distance to EVERYTHING in Uvita.
Cool off in the clear swimming holes of the Uvita River (located less than 100 yards away) and enjoy the soothing sounds of the river flowing by, and the wonderful sights of countless colorful birds that frequent the river corridor. Located in a very safe and quiet neighborhood, and just a few hundred yards from the Escuela Verde kindergarten, Uvita Christian Academy, and the Bahia Ballena public high school, children can easily walk or ride their bikes to school here. There is also a community soccer field right across the street, perfect for improving their skills (and burning off some energy!)
At the end of the dead-end road thereâs a pedestrian access to a remote section of nearby Playa Hermosa (the northern flank of the famous Whaleâs tail reef formation of Marino Ballena National Park), where you can enjoy sunsets over the big blue Pacific.
Cool off in your 360-degree infinity edge 20â x 30â pool, enjoy cold drinks and cook up your fresh catch from the nearby fish markets on your outdoor grill and huge outdoor and under-roof terrace lounge/wet bar/dining area. Modern appliances and fine finishes complete the kitchen and island area, and all three bedrooms have ensuite bathrooms (with one serving dual-purpose for guests from the living room).
Enjoy views of the dramatic 3,000-foot tall rainforest-covered mountains to the North and East and star-gazing at night from the second floor covered rooftop sky lounge. Embrace the convenience of secure gated and under-roof parking for two vehicles and plenty of room for storage adjacent to the laundry facilities.
This home is currently Under Construction and approximate completion date is late 2022.